To watch the live meeting proceedings, please refresh this page at the scheduled meeting time, a link labeled "In Progress" will appear under the 
Video column


File #: RFD-078-18    Version: 1 Name:
Type: Request for Decision Status: Agenda Ready
File created: 5/4/2018 In control: Council
On agenda: 5/22/2018 Final action:
Title: Meadowview Drive and Range Road 261A Rehabilitation
Sponsors: Integrated Growth
Attachments: 1. Request for Decision, 2. May 28, 2013 Request for Decision, 3. RR 261A KCB Initial Slope Assessment Report, 4. RR 261A Site Location Plan View

Title

Meadowview Drive and Range Road 261A Rehabilitation

 

Proposed Motion

1. That Council accept the Klohn Crippen Berger Ltd. Slope Assessment Report (May 9, 2018) as information; direct Administration to implement a short-term solution (temporary shifting of road - item 6.1.1 and 6.1.2); and include a long-term solution (relocating the road and erosion control - item 6.2) within the Meadowview Drive Rehabilitation Project.

 

2. That Council authorize Administration to transfer $100,000 from 8.17 Road Network Reserve (Capital) to Range Road 261A for the implementation of a short-term solution.

 

3. That Council direct Administration to focus feasibility and design for the Meadowview Drive Rehabilitation Project on the existing Meadowview Drive alignment, from Highway 44 to Range Road 261A, and without widening of the existing road right-of-way.

 

4. That Council direct Administration to obtain proposals for the detailed design and construction of Meadowview Drive Rehabilitation Project, and bring back a debenture bylaw for funding of these projects for design and construction.