Title
Meadowview Drive and Range Road 261A Rehabilitation
Proposed Motion
1. That Council accept the Klohn Crippen Berger Ltd. Slope Assessment Report (May 9, 2018) as information; direct Administration to implement a short-term solution (temporary shifting of road - item 6.1.1 and 6.1.2); and include a long-term solution (relocating the road and erosion control - item 6.2) within the Meadowview Drive Rehabilitation Project.
2. That Council authorize Administration to transfer $100,000 from 8.17 Road Network Reserve (Capital) to Range Road 261A for the implementation of a short-term solution.
3. That Council direct Administration to focus feasibility and design for the Meadowview Drive Rehabilitation Project on the existing Meadowview Drive alignment, from Highway 44 to Range Road 261A, and without widening of the existing road right-of-way.
4. That Council direct Administration to obtain proposals for the detailed design and construction of Meadowview Drive Rehabilitation Project, and bring back a debenture bylaw for funding of these projects for design and construction.